By application for qualifying manufacturers

The SmartSkin Line Insight Program

An exclusive program for manufacturers serious about line performance

The SmartSkin Line Insight Program gives qualifying manufacturers 15 months of SmartSkin, with a structured path to uncover hidden forces on your line, fix them at the source, and show measured results before your next budget review.

SmartSkin Analyzer base system in its carrying case with a rugged tablet and red Digital Container Twins for cans and bottles

Who the program is for

The program is built for teams who:

  • Deal with recurring breakage, container damage, rejects, or slowdowns they can’t trace to a clear cause

  • Are preparing for a change on the line, such as new formats, higher speeds, or lightweighting

  • Need objective data to back decisions on product quality, throughput, and line reliability

SmartSkin Digital Container Twins in pharmaceutical vial and syringe formats

What program members receive

  • A 15-month SmartSkin subscription, including the Analyzer base system and all Digital Container Twins in your order

  • A structured 15-month roadmap for your line

  • Dedicated specialist support or a results review

Your 15 months in the program

Twelve months shows you where the problems are. Fifteen months gives your team time to fix them and build a measured baseline for your line.

With that baseline, your team knows what normal looks like at every point on the line, spots changes before they become damage, troubleshoots in hours instead of days, and brings measured evidence to every decision.

  1. Months 1 to 3

    Find the root cause. Restore performance.

    Our Digital Container Twins reveal hidden forces on your line, helping your team make targeted adjustments and get operations back on track.

  2. Months 4 to 8

    Build routines that prevent problems.

    Your team establishes regular checks to catch changes early, prevent recurring issues, and keep production consistent.

  3. Months 9 to 15

    A framework you reuse anywhere.

    With proven checkpoints and routines in place, take your framework to the next line or site with confidence.

Teams like yours have reduced vial breakage by 70% and eliminated major can damage during a lightweighting project.

How to apply

  1. Apply.

    Tell us about your line and what you’re working to improve.

  2. Talk with a specialist.

    We’ll confirm the program is the right fit for your goals.

  3. Start your program.

    Your 15 months begin with your first Digital Container Twin run.

Program enrollment closes December 31, 2026

Program availability is limited to qualifying new SmartSkin customers.