Case Study
Quick damage diagnosis helps a plant return production to desired speed
A customer had been experiencing noticeable damage at regular speeds over 1700 CPM for an extended period of time and so had been running their lines at 1600 CPM. This was incurring months of production where they were losing 200 cans/min due to the lower speeds.

HIGHLIGHTS
Improved CPM from 1600-1800
Immediate identification of issue
Precise data-driven troubleshooting