Case Study
Quick damage diagnosis helps a plant return production to desired speed
A customer had been experiencing noticeable damage at regular speeds over 1700 CPM for an extended period of time and so had been running their lines at 1600 CPM. This was incurring months of production where they were losing 200 cans/min due to the lower speeds.

HIGHLIGHTS
Improved CPM from 1600-1800
Immediate identification of issue
Precise data-driven troubleshooting
Download the case study
More Resources
Using SmartSkin in clean room environments for pharmaceutical manufacturing
Cleanroom Classifications Manufacturing of sterile products takes place under highly controlled conditions to ensure absence of contamination. Introducing any material into a sterile manufacturing [...]
Quality Management Strategies Using SmartSkin Solutions
In the fast-paced world of beverage manufacturing, quality management is paramount. The high speeds, large volumes, and fragile materials such as aluminum, PET, and [...]