Case Study

Quick damage diagnosis helps a plant return production to desired speed

A customer had been experiencing noticeable damage at regular speeds over 1700 CPM for an extended period of time and so had been running their lines at 1600 CPM. This was incurring months of production where they were losing 200 cans/min due to the lower speeds.

HIGHLIGHTS

Improved CPM from 1600-1800

Immediate identification of issue

Precise data-driven troubleshooting

Download the case study

More Resources

Recent posts

View all