Customer Highlight
Elimination of major can damage for a Light weighting project
A plant was looking to take on a lightweighting project and opt for lighter cans on their line while maintaining the same line machine centers & conveyors. They were advised that with the current line age & status, it will not be possible to switch to the lighter cans. Additionally, they were advised to replace a palletizer which would have cost them another $1 million approximately.
![[F&B] Elimination of major can damage](https://smartskintech.com/wp-content/uploads/2024/04/FB-Elimination-of-major-can-damage.png)
HIGHLIGHTS
Elimination
of major forms of can damage
$1M+
In savings
3
months to initiate light weighting project
Download the case study
More Resources
Improving Pharmaceutical Quality, Patient Safety, and Operational Efficiency by Leveraging New Technologies
Imagine a world where every vial, syringe, cartridge and every drug is handled perfectly—without defects, recalls, or safety risks. That world is possible today [...]
The ROI of SmartSkin – Real Numbers from Leading Manufacturers
Investing in SmartSkin’s diagnostic and optimization technology is not just about improving efficiency—it’s about unlocking significant cost savings, increased production output, and improved product [...]