Customer Highlight
Optimizing daily operations to see comprehensive improvements and savings.
Initially, our current customer was facing frequent interruptions due to leakers in their aluminum can production lines. Due to significant product waste through leakers (estimated to be $300k USD per year) it was made evident that a process would need to be put in place

HIGHLIGHTS
Elimination of Leakers & Reduced downtimes
Prevention of further losses exceeding $650K
System in place for early damage detection
Download the case study
More Resources
Using SmartSkin in clean room environments for pharmaceutical manufacturing
Cleanroom Classifications Manufacturing of sterile products takes place under highly controlled conditions to ensure absence of contamination. Introducing any material into a sterile manufacturing [...]
Quality Management Strategies Using SmartSkin Solutions
In the fast-paced world of beverage manufacturing, quality management is paramount. The high speeds, large volumes, and fragile materials such as aluminum, PET, and [...]