Customer Highlight

Elimination of severe can damage and post seamer rejection rates.

A plant was incurring severe product loss and rejects on the line due to can damage along with experiencing frequent downtimes due to line crashes.

HIGHLIGHTS

Severe can damage eliminated

Line crashes & rejection rates significantly reduced

Frequent downtimes minimized

Download the case study

More Resources