Customer Highlight
Elimination of major can damage for a Light weighting project
A plant was looking to take on a lightweighting project and opt for lighter cans on their line while maintaining the same line machine centers & conveyors. They were advised that with the current line age & status, it will not be possible to switch to the lighter cans. Additionally, they were advised to replace a palletizer which would have cost them another $1 million approximately.
![[F&B] Elimination of major can damage](https://smartskintech.com/wp-content/uploads/2024/04/FB-Elimination-of-major-can-damage.png)
HIGHLIGHTS
Elimination
of major forms of can damage
$1M+
In savings
3
months to initiate light weighting project
Download the case study
More Resources
Commissioning Equipment with SmartSkin: Optimizing FAT/SAT process
Introduction: SmartSkin as an ideal solution for line commissioning: Factory Acceptance testing provides an efficient means for both manufacturers and end-users to verify that [...]
Louis Veronneau Joins SmartSkin
SmartSkin is pleased to announce that Louis Veronneau has joined the team as an Account Manager, Pharmaceutical. With over two decades of extensive experience [...]